§ 29-84 — Schedule RW (water heating)
Municipal Code of the City of Rock Hill, South Carolina (Codified through Ordinance No. 2026-49, adopted October 12, 2026. (Supp. No. 95, Update 1)) · Rock Hill Municipal Code § 29-84
Corpus is an independent public-information project, not the official City of Rock Hill website. Stable reference: corpuslaw.us/code/0a008762-9842-450e-bcbc-1314725f4fee
Sec. 29-84. - Schedule RW (water heating).
(a) Availability. (1) Schedule RW service is available only to residential consumers in residences or individually metered apartments for lighting, refrigeration, cooking, electric water heating, space heating and cooling or any other energy requirement properly servable by electricity, through a single metered service. (2) To receive service under this schedule, electric water heaters must be installed to supply the entire water heating requirements and shall meet the following conditions: a. Water heaters shall be of the automatic insulated storage type of not less than 30-gallon capacity, equipped with upper and lower heating units, each controlled by a separate thermostat, with maximum wattage as follows: Maximum Wattage Tank Capacity (gallons) | Upper Unit | Lower Unit 30—39 | 3,000 | 3,000 40—120 | 4,500 | 4,500 b. Heaters shall be equipped with interlocking thermostats to prevent simultaneous operation of the upper unit and the lower unit; however, if the sum of the wattage of the upper and lower unit does not exceed the maximum shown for the lower unit, no interlocking device shall be required. c. The upper heating unit may be eliminated provided the wattage of the lower unit equals the maximum shown for lower units. d. Heaters of larger than 120-gallon capacity shall be subject to special approval. (b) Character of service. (1) The city shall furnish 60 hertz service at approximately 120/240 volts, three-wire, single-phase; 120/240 volts, three-phase, whichever is available. (2) Where available, three-phase service will be supplied at 120/240 volts, four-wire service on the same meter as the other residential service. Where all service is supplied through one meter, it will be billed at the appropriate rate. Where additional service is supplied through a separate meter, it will be billed on the applicable rate schedule. (3) Where three-phase service is not available, it will be extended to the consumer's premises at the expense of the consumer. (c) Monthly rate. (1) Customer charge: $9.97/month. (2) Energy charge: First 500 kwh: 11.008 cents per kwh. Over 500 kwh: 12.141 cents per kwh. (d) Adjustment. The amount computed at the rate set out in subsection (c) of this section shall be adjusted plus or minus by an amount calculated in accordance with the formula specified in the city's purchased power cost adjustment clause, which is incorporated by reference as a part of this rate schedule. (e) Minimum charge. The monthly minimum charge shall be the customer charge. (f) Limitation of service. (1) This schedule will not be available to residential customers that do not have installed qualifying operating electric water heaters. (2) Motors frequently started or arranged for automatic control must be of a type to take minimum starting current and must be equipped with controlling devices approved by the city. (3) Prospective consumers should ascertain the available type of service by inquiring at the utility department before purchasing equipment. (4) Standby or resale service is not permitted under this schedule. (g) Interruption of service. (1) The city will make reasonable provisions to ensure satisfactory and continuous service, but does not guarantee a continuous supply of electrical energy and shall not be liable for damage occasioned by interruptions of service or failure to commence delivery caused by an act of God or the public enemy, or for any cause reasonably beyond its control, including but not limited to the failure or breakdown of generating, distribution or transmitting facilities, floods, fire, strikes, or action or order of any agency having jurisdiction in the premises, or for interruptions which are necessary for inspection, repair or changes in the distribution system of the city. (2) The customer shall notify the city immediately of any defects, trouble or accident which may in any way affect the delivery of power by the city to the customer.
(Code 1981, § 29-28(A)(I)(b); Ord. No. 2001-46, § 3, 6-25-2001; Ord. No. 2002-36, § 3, 6-24-2002; Ord. No. 2003-35, § 3, 6-23-2003; Ord. No. 2004-26, § 3, 6-28-2004; Ord. No. 2005-29, § 3, 6-27-2005; Ord. No. 2006-35, § 3, 6-26-2006; Ord. No. 2007-32, § 3, 6-25-2007; Ord. No. 2008-28, § 3, 6-23-2008; Ord. No. 2009-23, § 3, 6-22-2009; Ord. No. 2010-29, § 3, 6-28-2010; Ord. No. 2011-19, § 3, 6-27-2011; Ord. No. 2012-27, § 3, 6-25-2012; Ord. No. 2013-25, § 3, 6-24-2013; Ord. No. 2014-30, § 3, 6-23-2014; Ord. No. 2015-24, § 3, 6-22-2015; Ord. No. 2016-36, § 3, 6-27-2016; Ord. No. 2020-34, § 3, 6-22-2020)
Ask a question about Rock Hill law
Corpus searches the Rock Hill sections it holds and shows the ones that match, with their citations. Free, no sign-in.
