For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 29-93 — Capacity-based interruptible rider

Municipal Code of the City of Rock Hill, South Carolina (Codified through Ordinance No. 2026-49, adopted October 12, 2026. (Supp. No. 95, Update 1)) · Rock Hill Municipal Code § 29-93

Corpus is an independent public-information project, not the official City of Rock Hill website. Stable reference: corpuslaw.us/code/597af3c0-376b-43bd-b435-e672b492c871

Sec. 29-93. - Capacity-based interruptible rider.

(a) Definitions. The following words, terms and phrases, when used in this section, shall have the meanings ascribed to them in this subsection, except where the context clearly indicates a different meaning: Accident load profile at time of system peaks means the customer's actual load at the time of the city's coincident peak. Coincident peak means that demand on the city's system at a time which represents the aggregate peak incurred on the Duke energy system. Curtailable rider means a rider requiring reducing electric energy usage during a specified time period. Curtailed load means the same as the term "curtailed performance." Curtailment performance means the amount of load shed from the city's system measured with a load profile meter during the curtailment period. Curtailment performance is measured in kW for Rider-CBIR-1. Curtailment period means a period designated by the city as having a likely probability to establish a system peak demand. Curtailment season means the calendar days June 1 through September 30 each year. Historic load profile at time of system peak means the load which would normally be placed on the city's system by the customer during the time of system peak. The expected load will be determined based on load profiles exhibited during similar periods. Monthly capacity demand credit means the amount of benefit derived by reducing the city's supplemental capacity rate, i.e., the peak demand during the months in which the city utilizes supplemental capacity. Supplemental capacity means that amount of energy supplied to the city above and beyond its allocated capacity of the Catawba nuclear power plant. (b) Applicability. (1) The capacity based interruptible rider (Rider-CBIR-1) set forth in this rate schedule is applicable to specific customers who demonstrate a continuing ability and willingness to curtail 100 kW or more during the city's specified curtailment periods. The city reserves the right to limit participation in this Rider-CBIR-1. (2) This Rider-CBIR-1 is not available to customers who do not exhibit a minimum peak demand of 300 kW during the summer months of June, July, August, and September. Service under this Rider-CBIR-1 shall be used solely by a customer who is served at a single enterprise, located at a single location. To be considered a single enterprise, multiple facilities must be contiguous and capable of totalized metering. (3) Any customer desiring service under this Rider-CBIR-1 shall make application to the city in writing. Customer must attach to this application information to include the following items: a. A completed rider application form expressing customer's interest in service under the provisions of this Rider-CBIR-1. b. The itemized details of the equipment it plans to curtail by type and as measured in kW and its procedure to comply with curtailment period requests (see Rider-CBIR-1 application form). c. List of names of at least three individuals at the customer's facility who are able to respond to a request for curtailment. This list is to include work, home, pager, cell, and fax phone numbers or any other means that allow efficient communication channels (see Rider-CBIR-1 application form). The customer must sign a minimum one-year contract naming the city as the sole electric supplier for the duration of the contract. The customer is responsible for all costs associated with the installation of interval metering and applicable phone line communication charges. (4) The city shall review all such applications for service under this Rider-CBIR-1 and shall determine in its sole and final judgment whether this Rider-CBIR-1 shall be available for the load to which the application applies. The city will make this final judgment within 60 days of receipt of the CBIR-1 application. (c) Determination of customer credits. (1) The customer will continue to be charged at the prices specified in the rate schedule offered by the city. (2) Any curtailments under this Rider-CBIR-1 will be called for during the period of June 1 through September 30. The city will seek curtailments of no more than six hours per curtailment period. The city anticipates providing no less than two hours' notice prior to any curtailment period. A customer will be asked to curtail load no more than 20 times per curtailment season. (3) The city will credit the customer based on the customer's curtailment performance as it affects the city's supplemental capacity costs. Credits will be determined exclusively on a dollar per kW basis at the time of the city's coincident peaks with its supplemental capacity supplier during the curtailment period. (4) This monthly capacity demand credit is subject to change at the discretion of the city council. The city is required to notify the customer of any subject change, revision, alteration, or substitution to Rider CBIR-1 no less than 60 days prior to the effective date of the subject modification. (d) Adjustments to credits. These credits will be adjusted and issued during November based on the customer's curtailment performance and the supplemental power cost information available at that time. The city will determine customer's curtailment performance by subtracting the customer's actual load profile during the curtailment periods from the customers' historic load profile from a similar period of time. (e) Notices of curtailment and curtailment periods. (1) The city may establish a curtailment period by providing verbal notice to participant's customer by telephone that curtailment is required, whenever at the city's discretion such curtailment may be appropriate. The city will attempt to provide the customer with a two-hour notification period prior to the beginning of a curtailment period. However, the city is not obligated to do so and the customer will be expected to comply within one hour of the verbal notification. (2) The curtailment period shall continue until the city has provided notice of its termination, or a maximum of six hours, whichever is shorter. The maximum number of curtailment periods during a summer season (June through September) during a calendar year shall be 20. (f) Standby generator provision. Customers who have standby generation may operate that generation during the specified curtailment periods as a means of achieving curtailment performance. The standby generator may not be run in parallel with the city's system unless agreed to in writing by the city. Standby generation is to be run only in emergencies, for testing, or during curtailment periods. (g) Metering. (1) Metering equipment necessary to provide hourly load measurements and any other data reasonably required for the city to bill and otherwise account for service provided to the customer shall be furnished by the city at the expense of the customer. The city will own, install, and maintain the metering equipment. (2) The metering equipment shall be as specified and approved by the city. Metering equipment shall be installed and maintained in a manner that provides reliable and accurate data. The customer and the city will coordinate the location of the meter and the initial connection of the metering equipment and all subsequent modifications thereto. Such connection plans shall be subject to the city's approval.

(Ord. No. 2001-29, § 2, 4-23-2001; Ord. No. 2014-42, §§ 1—6, 9-8-2014)

Ask a question about Rock Hill law

Corpus searches the Rock Hill sections it holds and shows the ones that match, with their citations. Free, no sign-in.