§ 29-86 — Schedule GR (great rate, all-electric heat pump and water heating installed after July 1, 2005)
Municipal Code of the City of Rock Hill, South Carolina (Codified through Ordinance No. 2026-49, adopted October 12, 2026. (Supp. No. 95, Update 1)) · Rock Hill Municipal Code § 29-86
Corpus is an independent public-information project, not the official City of Rock Hill website. Stable reference: corpuslaw.us/code/cbcd4842-1dd6-4399-ba82-6b68b6e3a3cf
Sec. 29-86. - Schedule GR (great rate, all-electric heat pump and water heating installed after July 1, 2005).
(a) Availability. Schedule GR service is available only to residential consumers in residences or individually metered apartments for lighting, refrigeration, cooking, electric water heating, space heating and cooling by electric heat pump, or any other energy requirement properly servable by electricity, through a single metered service. To be eligible for this rate the customer's primary space and water heating source shall be electric-powered. Gas-powered accessories such as fireplace logs, grills, and appliances such as ranges and dryers are acceptable. The consumer agrees to remain an all-electric customer for a term of not less than five years. To receive service under this schedule, the electric heat pumps and electric water heating equipment must meet the following criteria: (1) Electric heat pumps must be installed to supply all the space conditioning requirements and shall meet the following conditions: a. The heat pumps must have a seasonal energy efficiency ratio (SEER) at a rate determined by the city utility department, such rate to be revised by the city utility department from time to time at its sole discretion; provided, however, that once schedule GR service is established at a residence or individually metered apartment, the SEER rating for that residence/apartment will remain constant for at least five years. b. An adjustable outdoor thermostat is required for all auxiliary heaters and should be set at the balance point. c. Heat pumps shall be controlled by two-stage heating thermostats, the first stage controlling compressor operation and the second stage controlling all auxiliary resistance heaters. Auxiliary heaters shall be limited to 48 amps (11.5 kw at 240 volts) each and shall be switched so that the energizing of each successive heater is controlled by a separate adjustable outdoor thermostat. A mutual switch for bypass of the first stage and the interlock of the second stage of the heating thermostat will be permitted. d. The heat pump is required to have a smart switch installed. A city technician will verify smart switch installation before qualifying a customer for this rate. (2) Electric water heaters must be installed to supply the entire water heating requirements and shall meet the following conditions: a. Water heaters shall be of the automatics insulated storage type of not less than 30-gallon capacity, equipped with upper and lower heating units, each controlled by a separate thermostat, with maximum wattage as follows: Maximum Wattage Tank Capacity (gallons) | Upper Unit | Lower Unit 30—39 | 3,000 | 3,000 40—120 | 4,500 | 4,500 b. Heaters shall be equipped with interlocking thermostats to prevent simultaneous operation of the upper unit and the lower unit; however, if the sum of the wattage of the upper and lower unit does not exceed the maximum shown for the lower unit, no interlocking device shall be required. c. The upper heating unit may be eliminated provided the wattage of lower unit equals the maximum shown for the lower units. d. Heaters of larger than 120-gallon capacity shall be subject to special approval. (b) Character of service. (1) The city shall furnish 60 hertz service at approximately 120/240 volts, three-wire, single-phase, 120/240 volts, three-phase, whichever is available. (2) Where available, three-phase service will be supplied at 120/240 volts, four-wire service on the same meter as the other residential service. (3) Where three-phase service is not available, it will be extended to the consumer's premises at the expense of the consumer. (c) Monthly rate. (1) Summer. Applicable to bills rendered during the period of April 1 through November 30: a. Customer charge: $9.97/month. b. Energy charge: First 900 kwh: 11.008 cents per kwh. Over 900 kwh: 12.141 cents per kwh. (2) Winter. Applicable to bills rendered during the period of December 1 through March 31: a. Customer charge: $9.97/month. b. Energy charge: First 500 kwh: 11.008 cents per kwh. Over 500 kwh: 7.590 cents per kwh. (d) Adjustment. The amount computed at the rate set out in subsection (c) of this section shall be adjusted plus or minus by an amount calculated in accordance with the formula specified in the city's purchased power cost adjustment clause, which is incorporated by reference as part of this rate schedule. (e) Minimum charge. The monthly charge shall be the customer charge. (f) Limitation of service. (1) This schedule will not be available to residential customers that do not have installed qualifying operating electric heat pumps and electric water heaters. (2) Motors frequently started or arranged for automatic control must be of a type to take minimum starting current and must be equipped with controlling devices approved by the city. (3) Prospective consumers should ascertain the available type of service by inquiring at the utility department before purchasing equipment. (4) Standby or resale service is not permitted under this schedule. (g) Interruption of service. (1) The city will make reasonable provisions to ensure satisfactory and continuous service, but does not guarantee a continuous supply of electrical energy and shall not be liable for damage occasioned by interruptions of service or failure to commence delivery caused by an act of God, or the public enemy, or for any cause reasonably beyond its control, including, but not limited to, the failure or breakdown of generating, distribution, or transmitting facilities, floods, fire, strikes, or action or order of any agency having jurisdiction in the premises, or for interruptions which are necessary for inspection, repair, or changes in the distribution system of the city. (2) The customer shall notify the city immediately of any defects, trouble, or accident which may in any way affect the delivery of power by the city to the customer.
(Code 1981, § 29-28(A)(I)(d); Ord. No. 2001-46, § 3, 6-25-2001; Ord. No. 2002-16, §§ 4, 5, 4-8-2002; Ord. No. 2002-36, § 3, 6-24-2002; Ord. No. 2003-35, § 3, 6-23-2003; Ord. No. 2004-26, § 3, 6-28-2004; Ord. No. 2005-29, § 3, 6-27-2005; Ord. No. 2006-35, § 3, 6-26-2006; Ord. No. 2007-32, § 3, 6-25-2007; Ord. No. 2008-28, § 3, 6-23-2008; Ord. No. 2009-23, § 3, 6-22-2009; Ord. No. 2010-29, § 3, 6-28-2010; Ord. No. 2011-19, § 3, 6-27-2011; Ord. No. 2012-27, § 3, 6-25-2012; Ord. No. 2013-25, § 3, 6-24-2013; Ord. No. 2014-30, § 3, 6-23-2014; Ord. No. 2015-24, § 3, 6-22-2015; Ord. No. 2016-36, § 3, 6-27-2016; Ord. No. 2019-38, § 3(Exh. A), 6-24-2019; Ord. No. 2020-34, § 3, 6-22-2020; Ord. No. 2021-7, § 3(Exh. A), 2-8-2021, eff. 2-1-2021)
Ask a question about Rock Hill law
Corpus searches the Rock Hill sections it holds and shows the ones that match, with their citations. Free, no sign-in.
