Sec. 29-91. - Schedule EDR-2 (economic development rate-2).

(a) Availability. (1) Schedule EDR-2 service is available only to manufacturing, distribution or corporate headquarters facilities having: (i) an average monthly metered demand, during the most recent 12-month period, in excess of 250 kw; and (ii) an average monthly load factor, during the most recent 12-month period, of not less than 70 percent. Continued service under this rate shall be subject to the load continuing to meet these criteria. If at any point in time a customer fails to maintain these criteria, the city will make final determination as to whether or not the customer may continue service under this rate schedule. (2) Service under this schedule will be available to qualifying customers through a single meter at one delivery point. (b) Character of service. The city will furnish 60 hertz, three-phase, 277/480 volts, four-wire, wye. Where three-phase is not available, it will be extended to the customer's premises. (c) Limitation of service. (1) The following requirements shall be applicable to the use of electric motors: Motors of ten horsepower or larger which are frequently started shall be equipped with over-current protective devices in each phase conductor, and also be equipped with starting equipment set to a limit of 300 percent of full load current, or 65 percent of locked motor current value. Motors of ten horsepower and larger having intermittent or continuous duty shall be equipped with over-current protective devices in each phase conductor; they shall also be equipped with starting equipment set to a limit of 300 percent of full load current, except where served from a separate transformer installation and no other consumer is served from the same bank of transformers. (2) The obligation of the city in regard to supplying power is dependent upon its securing and retaining all necessary rights-of-way, privileges and permits for the delivery of such power; and the city shall not be liable to any consumer or applicant for power if it is delayed in or is prevented from furnishing power by its failure to secure and retain such rights-of-way, privileges and permits. (3) Standby or resale service is not permitted under this rate schedule. (d) Special conditions. (1) Before wiring any premises or purchasing equipment for any premises, the consumer shall give the city notice in writing of the location of the building, together with a list of the electrical devices to be used thereon. The city shall specify the voltage and type of electrical service to be furnished, as well as the location of the meter and the point where the service connections shall be made. (2) Temporary construction service may be supplied at whatever voltage is available, provided the applicant agrees to defray all installation and removal costs necessary to providing service, and to place on deposit with the city an amount equal to these costs before the work is undertaken. (3) An application and contract in writing shall be required, which when accepted by the proper officers of the city shall constitute the contract between the consumer and the city. No promises, agreements, statements or representations of any agent or employee of the city, or other person, shall be of any binding force or effect unless incorporated in writing in such contract. The contract shall not be transferable or assignable without written consent of the city. (4) On initial installations, the service agreement shall extend for a term adequate to reasonably amortize specific installation costs incurred by the city. Thereafter, the service agreement shall be renewable during such terms as shall reasonably enable the city to properly anticipate and meet the load requirements of the customer, with reasonable provision for termination, on adequate notice to the city. (e) Monthly rate. (1) Customer charge: $79.10 per month. (2) Demand charge per kw of billing demand: Summer: $23.782 per kw. Winter: $13.290 per kw. (3) Energy charge: 5.294 cents per kwh. (f) Adjustment. The amount computed at the rate set out in subsection (e) of this section shall be adjusted plus or minus by an amount calculated in accordance with the formula specified in the city's purchased power cost adjustment clause, which is incorporated by reference as a part of this rate schedule. (g) Minimum charge. The monthly minimum charge shall be the customer charge plus the demand charge, if any. (h) Determination of billing demand. (1) The demand for billing purposes each month shall be the maximum integrated 30-minute demand in the month for which the bill is rendered, but not less than 50 percent of the contract demand, and not less than 250 kw. (2) The winter period as referred to in this schedule is applicable during the period of October 16 through March 15. The summer period as referred to in this schedule is applicable during the period of March 16 to October 15. (i) Power factor correction. When the monthly power factor of the consumer's power requirements is less than 85 percent, the billing demand in kilowatts will be corrected for that month by multiplying the billing demand by 85 percent and dividing same by the power factor for that month, expressed in percentages. (j) Interruption of service. (1) The city will make reasonable provisions to ensure satisfactory and continuous service, but does not guarantee a continuous supply of electrical energy and shall not be liable for damages occasioned by interruptions of service or failure to commence delivery caused by an act of God or the public enemy, or for any cause reasonably beyond its control, including but not limited to the failure or breakdown of generating, distribution or transmitting facilities, floods, fire, strikes, or action or order of any agency having jurisdiction in the premises, or for interruptions which are necessary for inspection, repair or changes in the distribution system of the city. (2) The customer shall notify the city immediately of any defects, trouble or accident which may in any way affect the delivery of power by the city to the customer. (k) Special EDR-2 Rider. (1) Rider availability. Available only for service provided by the city under Rate Schedule EDR-2 to establishments classified as Retail Trade by the Standard Industrial Classification (SIC) Manual published by the United States Government. This credit is available for load associated with initial permanent service to the occupation of existing 20,000 square feet or greater buildings, that have been vacant for a minimum of six months, by a new customer. The building must have been fully occupied for a minimum of 12 months prior to becoming vacant. Newly constructed shell buildings will not be qualified for this rider. The New Load must average 250 KW, during the most recent 12-month period, at a single delivery point to qualify for this credit. The customer must have an average monthly load factor, during the most recent 12-month period, of not less than 70 percent. Continued service under this rate rider shall be subject to the load continuing to meet the aforementioned criteria. If at any point in time, a customer fails to maintain these criteria, the city will make the final determination as to whether or not the customer may continue service under this rate schedule. A change in ownership of an existing establishment will not be considered to result in new load for purposes of determining the applicability of this rider. However, if a change in ownership occurs after the customer contracts with the city for service approved as new load pursuant to this rider, this rider shall continue to apply to the city's service of the new load. This credit is not available for load increases that result from renewal of service following interruptions, such as equipment failure, temporary plant shutdown, strike or economic conditions. (2) Rider definitions. a. New load. New load is additional load which is added to the city's system by occupation of an existing building by a new customer. New load is the net incremental load above that which existed prior to approval of the applicability of this credit. b. Delivery date. The delivery date is the first date the new load is supplied by the city. c. Operational date. The operational date shall be the date the customer's establishment is deemed by agreement of the city to be fully operational, but shall be no more than three months after the delivery date. (3) General provisions. a. Rider term. The rider will be available to the customer for a maximum period of 60 months immediately following the operational date. Following, the first 60 months, the customer will be moved to another applicable rate. b. Contract period. Each customer shall enter into a contract to purchase electricity from the city for a minimum original term of ten years. The original term of ten years shall begin on the operational date. This rider shall not apply for a period of more than 60 months. c. Metering. Metering equipment necessary to provide hourly load measurements and any other data reasonably required for the city to bill and otherwise account for service provided to the customer under this rider shall be furnished, owned, installed and maintained by the city.

(Code 1981, § 29-28(A)(II)(e); Ord. No. 2001-46, § 3, 6-25-2001; Ord. No. 2002-16, § 6, 4-8-2002; Ord. No. 2002-36, § 3, 6-24-2002; Ord. No. 2003-35, § 3, 6-23-2003; Ord. No. 2004-26, § 3, 6-28-2004; Ord. No. 2005-29, § 3, 6-27-2005; Ord. No. 2006-35, § 3, 6-26-2006; Ord. No. 2007-11, § 3(Exh. A), 2-26-2007; Ord. No. 2007-32, § 3, 6-25-2007; Ord. No. 2008-28, § 3, 6-23-2008; Ord. No. 2009-23, § 3, 6-22-2009; Ord. No. 2010-29, § 3, 6-28-2010; Ord. No. 2011-19, § 3, 6-27-2011; Ord. No. 2012-27, § 3, 6-25-2012; Ord. No. 2013-25, § 3, 6-24-2013; Ord. No. 2014-30, § 3, 6-23-2014; Ord. No. 2015-24, § 3, 6-22-2015; Ord. No. 2016-36, § 3, 6-27-2016; Ord. No. 2024-38, § 3, 6-24-2024)