For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 29-99 — Schedule U (university rate)

Municipal Code of the City of Rock Hill, South Carolina (Codified through Ordinance No. 2026-49, adopted October 12, 2026. (Supp. No. 95, Update 1)) · Rock Hill Municipal Code § 29-99

Corpus is an independent public-information project, not the official City of Rock Hill website. Stable reference: corpuslaw.us/code/bf7c7ea8-dead-4363-8431-55432225d1aa

Sec. 29-99. - Schedule U (university rate).

(a) Availability. The city offers a university rate for each university, as that term is defined in this section. (b) Definitions. For purposes of this section 29-99, the following definitions shall apply. (1) A "university" is any post-secondary institution of higher learning organized and incorporated for the purpose of imparting instruction, examining students, and otherwise promoting education. A university may consist of one or more colleges or without having any college associated with or connected to it. (2) The term "month" as used in the following Schedule means the period intervening between meter reading for the purpose of monthly billings. Readings are taken each month at intervals of approximately 30 days. Summer months rates apply to service from June 1 through September 30. Winter months rates apply to service from October 1 through May 31. For customers in billing cycles 1—14 and 21—34, summer months rates apply to the billing months of July through October. Winter months rates apply to the billing months of November through June. (c) Character of service. The city will furnish 60 Hertz service through one meter, at one delivery point, at one of the following approximate voltages, where available: (1) Single-phase, 120/240 volts; or (2) Three-phase, 208Y/120 volts, 460Y/277 volts; or (3) Three-phase, 3-wire, 240, 460, 480, 575, or 2300 volts; or (4) Three-phase, 4160Y/2400, 12470Y/7200, or 24940 Y/14400 volts; or (5) Three-phase voltages other than those listed above may be at the city's option if the size of the customer's contract warrants a substation solely to serve that customer, and if the customer furnished suitable outdoor space on the premises to accommodate a ground-type transformer installation, or substation, or a transformer vault built in accordance with the city's specifications. (d) Limitation of service. The following limitations will be applicable to all customers utilizing the university rate. (1) The character of service supplied will depend upon the voltage available. Prospective customers should determine the available voltage by contacting the city before purchasing equipment. (2) Motors of less than five h.p. may be single-phase. All motors of more than five h.p. must be equipped with starting compensators. The city reserves the right, when in its opinion the installation would not be detrimental to the services of the city, to permit other types of motors. (e) Rates. (1) Basic facilities charge .....$52.004 (2) Demand charge: a. On-peak demand charge per month: Summer Months (June 1—September 30) | Winter Months (October 1—May 31) For the first 2,000 KW of billing demand per month | $20.398 per KW | $11.930 per KW For the next 3,000 KW of billing demand per month | $18.096 per KW | $9.890 per KW For all over 5,000 KW of billing demand per month | $14.484 per KW | $7.341 per KW b. Economy demand charge per month: Summer Months (June 1—September 30) | Winter Months (October 1—May 31) $1.569 per KW | $1.569 per KW (3) Energy charge: a. All on-peak energy per month: Summer Months (June 1—September 30) | Winter Months (October 1—May 31) 6.7214 cents per KWH | 6.7214 cents per KWH b. All off-peak energy per month: Summer Months (June 1—September 30) | Winter Months (October 1—May 31) 2.5960 cents per KWH | 2.5960 cents per KWH (f) Determination of on-peak and off-peak hours. Summer Months (June 1—September 30) | Winter Months (October 1—May 31) On-peak period hours | 1:00 p.m.—9:00 p.m. Monday—Friday | 6:00 a.m.—1:00 p.m. Monday—Friday Off-peak period hours | All other weekday hours and all Saturday and Sunday hours. (g) Adjustment for fuel costs. The city's adjustment for fuel costs is incorporated as a part of, and will apply to all services supplied under, this schedule. (h) Contract demand. The city will require contracts to specify the maximum demand to be delivered to the customer which shall be the contract demand. Where the customer can restrict on-peak demand to levels considerably below that of the contract demand, the city may also contract for a limited on-peak contract demand in addition to the contract demand. (i) Determination of billing demand. (1) The on-peak billing demand each month shall be the largest of the following: a. The maximum integrated 30-minute demand during the applicable summer or winter on-peak period during the month for which the bill is rendered; b. Fifty percent of the contract demand (or 50 percent of the on-peak contract demand if such is specified in the contract); or c. Fifteen KW. (2) Economy demand. To determine the economy demand, the larger of: a. The maximum integrated 30-minute demand during the month for which the bill is rendered; or b. Fifty percent of the contract demand shall be compared to the on-peak billing demand as determined in subsection (1) above. If the demand determined by the larger of subsections (2)a. and (2)b. above exceeds the on-peak billing demand, the difference shall be the economy demand. (j) Minimum bill. The minimum bill shall be the bill calculated on the rate above including the basic facilities, demand charge, and energy charge, but the sum of the on-peak demand charge and the economy demand charge shall not be less than $2.22 per month per KW of contract demand. If the customer's measured demand exceeds the contract demand, the city may at any time establish the minimum based on the maximum integrated demand in the previous 12 months including the month for which the bill rendered. (k) Power factor correction. When the monthly power factor of the customer's power requirements is less than 85 percent, the city may correct the integrated demand in kilowatts for that month by multiplying by 85 percent and dividing by the power factor in percent for that month.

(Ord. No. 2002-39, § 3, 6-24-2002; Ord. No. 2003-35, § 3, 6-23-2003; Ord. No. 2004-26, § 3, 6-28-2004; Ord. No. 2005-29, § 3, 6-27-2005; Ord. No. 2006-35, § 3, 6-26-2006; Ord. No. 2007-32, § 3, 6-25-2007; Ord. No. 2008-28, § 3, 6-23-2008; Ord. No. 2009-23, § 3, 6-22-2009; Ord. No. 2010-29, § 3, 6-28-2010; Ord. No. 2011-19, § 3, 6-27-2011; Ord. No. 2012-27, § 3, 6-25-2012; Ord. No. 2013-25, § 3, 6-24-2013; Ord. No. 2014-30, § 3, 6-23-2014; Ord. No. 2015-24, § 3, 6-22-2015; Ord. No. 2016-36, § 3, 6-27-2016; Ord. No. 2024-38, § 4, 6-24-2024)

Ask a question about Rock Hill law

Corpus searches the Rock Hill sections it holds and shows the ones that match, with their citations. Free, no sign-in.