§ 29-92 — Schedule PS (public school rate)
Municipal Code of the City of Rock Hill, South Carolina (Codified through Ordinance No. 2026-49, adopted October 12, 2026. (Supp. No. 95, Update 1)) · Rock Hill Municipal Code § 29-92
Corpus is an independent public-information project, not the official City of Rock Hill website. Stable reference: corpuslaw.us/code/4fca48f9-6bfc-47cb-9f99-1d7d67c6999b
Sec. 29-92. - Schedule PS (public school rate).
(a) Availability. The city offers a public school rate for each public school that fits the following criteria: (i) has an average monthly metered demand, during the most recent 12-month period, in excess of 300 kw; and (ii) has not been served by the city prior to the date on which service of such load under this rate schedule commences. Service under this rate schedule will be available to the qualifying customer through a single meter at one delivery point. Continued service under this rate schedule shall be subject to the load continuing to meet these criteria. (b) Character of service. The city will furnish 60 hertz, three-phase 120/208 or 277/480 volts, four-wire, wye. Where three-phase is not available, it will be extended to the consumer's premises. (c) Limitation of service. (1) The following requirements shall be applicable to the use of electric motors: Motors of ten horsepower or larger which are frequently started shall be equipped with over-current protective devices in each phase conductor, and also be equipped with starting equipment set to a limit of 300 percent of full load current, or 65 percent of locked motor current value. Motors of ten horsepower and larger having intermittent or continuous duty shall be equipped with starting equipment set to a limit of 300 percent of full load current, except where served from a separate transformer installation and no other consumer is served from the same bank of transformers. (2) The obligation of the city in regard to supplying power is dependent upon its securing and retaining all necessary rights-of-way, privileges and permits for the delivery of such power, and the city shall not be liable to any consumer or applicant for power if it is delayed in or is prevented from furnishing power by its failure to secure and retain such rights-of-way, privileges and permits. (3) Standby or resale service is not permitted under this rate schedule. (d) Special conditions. (1) Before wiring any premises or purchasing equipment for any premises, the consumer shall give the city notice in writing of the location of the building, together with a list of the electrical devices to be used thereon. The city shall specify the voltage and type of electrical service to be furnished, as well as the location of the meter and the point where the service connections shall be made. (2) Temporary construction service may be supplied at whatever voltage is available, provided the applicant agrees to defray all installation and removal costs necessary to providing service, and to place on deposit with the city any amount equal to these costs before the work is undertaken. (3) An application and contract in writing shall be required, which when accepted by the proper officers of the city shall constitute the contract between the consumer and the city. No promises, agreements, statements or representations of any agent or employee of the city, or other person, shall be of any binding force or effect unless incorporated in writing in such contract. The contract shall not be transferable or assignable without the written consent of the city. (4) On initial installations, the service agreement shall extend for a term adequate to reasonably amortize specific installation costs incurred by the city. Thereafter, the service agreement shall be renewable during such terms as shall reasonably enable the city to properly anticipate and meet the load requirements of the customer. (e) Monthly rate. (1) Basic facilities charge: $27.24. (2) Demand charge per kw of billing demand: First 30 kw: $0.0000 Over 30 kw: $5.4568 (3) Energy charge: For the first 125 kwh per kw of billing demand: First 3,000 kwh: $0.156347 Next 87,000 kwh: $0.090561 Over 90,000 kwh: $0.076118 For the next 275 kwh per kw of billing demand: First 6,000 kwh: $0.091730 Next 134,000 kwh: $0.090705 Over 140,000 kwh: $0.080275 For all kwh in excess of 400 kwh per kw of billing demand: $0.071455 (f) Adjustment. The amount computed at the rate set out in subsection (e) of this section may be adjusted plus or minus by an amount calculated in accordance with the formula specified in the city's purchased power cost adjustment clause, which is incorporated by reference as a part of this rate schedule. (g) Minimum charge. The monthly minimum charge shall be the customer charge plus the demand charge, if any. (h) Determination of billing demand and energy. The billing demand each month shall be the largest of the following: (1) The maximum integrated 30-minute demand measured during the month for which the bill is rendered. (2) Fifty percent of the maximum integrated 30-minute demand during the billing months of June—September within the previous 12 months including the month for which the bill is rendered. (3) Fifty percent of the contract demand. (4) 30 kilowatts (kw). (i) Power factor correction. When the monthly power factor of the consumer's power requirements is less than 85 percent, the billing demand in kilowatts will be corrected for that month by multiplying the billing demand by 85 percent and dividing same by the power factor for that month, expressed in percentages. (j) Interruption of service. (1) The city will make reasonable provisions to ensure satisfactory and continuous service, but does not guarantee a continuous supply of electrical energy and shall not be liable for damages occasioned by interruptions of service or failure to commence delivery caused by an act of God or the public enemy, or for any cause reasonably beyond its control, including but not limited to the failure or breakdown of generating, distribution or transmitting facilities, floods, fire, strikes, or actions or order of any agency having jurisdiction in the premises, or for interruptions which are necessary for inspection, repair or changes in the distribution system of the city. (2) The customer shall notify the city immediately of any defects, trouble or accident which may in any way affect the delivery of power by the city to the customer.
(Code 1981, § 29-28(A)(II)(f); Ord. No. 2001-46, § 3, 6-25-2001; Ord. No. 2002-36, § 3, 6-24-2002; Ord. No. 2003-35, § 3, 6-23-2003; Ord. No. 2004-26, § 3, 6-28-2004; Ord. No. 2005-14, § 3, 4-11-2005; Ord. No. 2005-29, § 3, 6-27-2005; Ord. No. 2006-35, § 3, 6-26-2006; Ord. No. 2007-32, § 3, 6-25-2007; Ord. No. 2008-28, § 3, 6-23-2008; Ord. No. 2009-23, § 3, 6-22-2009; Ord. No. 2010-29, § 3, 6-28-2010; Ord. No. 2011-19, § 3, 6-27-2011; Ord. No. 2012-27, § 3, 6-25-2012; Ord. No. 2013-25, § 3, 6-24-2013; Ord. No. 2014-30, § 3, 6-23-2014; Ord. No. 2015-24, § 3, 6-22-2015; Ord. No. 2016-36, § 3, 6-27-2016; Ord. No. 2020-34, §§ 3, 4, 6-22-2020; Ord. No. 2024-38, § 3, 6-24-2024)
Ask a question about Rock Hill law
Corpus searches the Rock Hill sections it holds and shows the ones that match, with their citations. Free, no sign-in.
