For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 29-87 — Schedule GS (nondemand service)

Municipal Code of the City of Rock Hill, South Carolina (Codified through Ordinance No. 2026-49, adopted October 12, 2026. (Supp. No. 95, Update 1)) · Rock Hill Municipal Code § 29-87

Corpus is an independent public-information project, not the official City of Rock Hill website. Stable reference: corpuslaw.us/code/1e3a90db-fcac-49ae-b7a6-179b39aaf5ae

Sec. 29-87. - Schedule GS (nondemand service).

(a) Availability. Schedule GS service is available only to commercial consumers, for all lighting, cooking, heating, refrigeration and other power service supplied to the individual store or commercial establishment, and for temporary service for construction or any other temporary purposes, through a single meter at one delivery point, where demand loads are less than 30 kw. (b) Character of service. (1) The city will furnish 60 hertz single-phase service at approximately 120/240 volts, three-wire. Three-phase service may be supplied, if available, either at 120/240 volts, four-wire, delta; or 120/208 volts, four-wire, wye. (2) Where three-phase service is not available, it will be extended to the consumer's premises at the consumer's expense. (c) Limitation of service. (1) The following requirements shall be applicable to the use of electric motors. Motors of ten horsepower or larger which are frequently started shall be equipped with over-current protective devices in each phase conductor, and also be equipped with starting equipment set to a limit of 300 percent of full load current, or 65 percent of locked motor current value. Motors of ten horsepower and larger having intermittent or continuous duty shall be equipped with over-current protective devices in each phase conductor; they shall also be equipped with starting equipment set to a limit of 300 percent of full load current, except where served from a separate transformer installation and no other consumer is served from the same bank of transformers. (2) The obligation of the city in regard to supplying power is dependent upon its securing and retaining all necessary rights-of-way, privileges and permits for the delivery of such power, and the city shall not be liable to any consumer or applicant for power if it is delayed in or is prevented from furnishing power by its failure to secure and retain such rights-of-way, privileges and permits. (3) Before wiring any premises or purchasing equipment for any premises, the consumer shall give the city notice in writing of the location of the building, together with a list of the electrical devices to be used thereon, and shall ascertain the character of service available at such premises. The city shall specify the voltage and type of electrical service to be furnished, as well as the location of the meter and the point where the service connections shall be made. (4) Electric underground service lines or conduits may be permitted, but the installation and maintenance of such underground circuits will be at the expense of the consumer. (5) Temporary construction service may be supplied at whatever voltage is available, provided the applicant agrees to defray all installation and removal costs necessary to providing service, and to place on deposit with the city an amount equal to these costs before the work is undertaken. (6) An application and contract in writing shall be required, which when accepted by the proper officers of the city shall constitute the contract between the consumer and the city. No promises, agreements, statements or representations of any agent or employee of the city, or other person, shall be of any binding force or effect unless incorporated in writing in such contract. The contract shall not be transferable or assignable without written consent of the city. (7) On initial installations, the service agreement shall extend for a term adequate to reasonably amortize specific installations costs incurred by the city. Thereafter, the service agreement shall be renewable during such terms as shall reasonably enable the city to properly anticipate and meet the load requirements of the customer, with reasonable provision for termination, on adequate notice to the city. (8) Standby or resale service is not permitted under this rate schedule. (d) Monthly rate. (1) Customer charge: $11.56/month. (2) Energy charge: First 3,000 kwh: 17.459 cents per kwh. Over 3,000 kwh: 12.695 cents per kwh. (e) Adjustment. The amount computed at the rate set out in subsection (d) of this section shall be adjusted plus or minus by an amount calculated in accordance with the formula specified in the city's purchased power cost adjustment clause, which is incorporated by reference as a part of this rate schedule. (f) Minimum charge. The monthly minimum charge shall be the customer charge. (g) Interruption of service. (1) The city will make reasonable provisions to ensure satisfactory and continuous service, but does not guarantee a continuous supply of electrical energy and shall not be liable for damage occasioned by interruptions of service or failure to commence delivery caused by an act of God or the public enemy, or for any cause reasonably beyond its control, including but not limited to the failure or breakdown of generating, distribution or transmitting facilities, floods, fire, strikes, or action or order of any agency having jurisdiction in the premises, or for interruptions which are necessary for inspection, repair or changes in the distribution system of the city. (2) The customer shall notify the city immediately of any defects, trouble or accident which may in any way affect the delivery of power by the city to the customer.

(Code 1981, § 29-28(A)(II)(a); Ord. No. 2001-46, § 3, 6-25-2001; Ord. No. 2002-36, § 3, 6-24-2002; Ord. No. 2003-35, § 3, 6-23-2003; Ord. No. 2004-26, § 3, 6-28-2004; Ord. No. 2005-29, § 3, 6-27-2005; Ord. No. 2006-35, § 3, 6-26-2006; Ord. No. 2007-32, § 3, 6-25-2007; Ord. No. 2008-28, § 3, 6-23-2008; Ord. No. 2009-23, § 3, 6-22-2009; Ord. No. 2010-29, § 3, 6-28-2010; Ord. No. 2011-19, § 3, 6-27-2011; Ord. No. 2012-27, § 3, 6-25-2012; Ord. No. 2013-25, § 3, 6-24-2013; Ord. No. 2014-30, § 3, 6-23-2014; Ord. No. 2015-24, § 3, 6-22-2015; Ord. No. 2016-36, § 3, 6-27-2016)

Ask a question about Rock Hill law

Corpus searches the Rock Hill sections it holds and shows the ones that match, with their citations. Free, no sign-in.