Sec. 18-396. - Permit required.
Before proceeding with the construction, installation, erection, alteration or remodeling of any boiler, furnace, incinerator or other heat producing apparatus, a permit shall first be obtained from the chief building inspector by the heating contractor or owner. An application shall be filed specifying in detail the work to be done and be accompanied by the fee as set forth in section 18-95.
(Code 1973, § 30.36.010(a))