For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 1300.2 — System Requirements

Atlanta City Code (Code of Ordinances, Part II) (Supp. No. 108, Update 1: codified through Ordinance No. 2026-37 (26-O-1511), enacted September 30, 2026) · Atlanta Land Development Code, App. C, ch. I, § 1300.2

Corpus is an independent public-information project, not the official City of Atlanta website. Stable reference: corpuslaw.us/code/138eaffc-0e26-496e-a01e-0641109f8172

1300.2. - System Requirements.

(a) Potable rainwater catchment systems shall have chlorination, UV, ozone or iodine treatment. (b) A plumbing permit and licensed plumber are required for the installation of a potable rainwater catchment system. Other permits may be required on a case by case basis as determined by the appropriate City of Atlanta department, including: (1) an electrical permit for the pump and other electrical controls; (2) building permits for cistern footings, foundations, enclosures and roof structures; and (3) grading and erosion control permits for system construction. (c) Potable rainwater catchment systems are intended for single-family homes and shall be maintained in functioning order for the life of the system. It is solely the property owner's responsibility to maintain thesystem according to manufactures recommendations and keep written documentation of maintenance provided for each year of service of the system. Filtration and disinfection shall be serviced according to manufactures recommendations, (d) Potable rainwater catchment system abandonment and potable water installations require a permit, inspection and approval. If the owner of a potable rainwater catchment system elects to cease use of, or fails to properly maintain such system, they shall abandon the system and either (1) remove the system entirely, or (2) replace the potable rainwater catchment pipe system with an approved potable water supply pipe system. Where an existing potable pipe system is already in place, fixtures may be re-connected to the existing system; and (3) the abandonment shall be recorded by the department of watershed management noting the deletion of the system.

(Ord. No. 2011-43(11-O-0740), § 1, 9-28-11)

Ask a question about Atlanta law

Corpus searches the Atlanta sections it holds and shows the ones that match, with their citations. Free, no sign-in.